Cankaya notes that copper-connected scale-up domains (for example NVL72 racks and TPU v7 cubes) are much harder to tap than fibre, and that optical budgets make passive taps impractical on 400GBASE-SR8 multimode links 2. Amodo found no taps advertised for 53 GBaud links as of May 2026 6.